Improvement of Bayubay Sur Lot

- A. Other General Requirements
- 1 each Project Billboard
- 1 mo. Occupational Safety and Health Program
- B. Finishing and Other Civil Works
- 24.42 cu.m. Structure Excavation
- 68.20 cu.m. Embankment from Excavation
- 3.00 cu.m. Gravel Bedding
- 11.83 cu.m. Structural Concrete
- 941 kgs. Reinforcement Steel (Deformed) Grade 40
- 67.00 sq.m. Formworks abd Falseworks
- 76.30 sq.m. Cement Plaster Finish
- 52.00 sq.m. 150mm CHB Nonload bearing (including Reinforcing steel)
- 1.00 I.s. Cyclone Wire (GI Pipe Framed) w/ Gate
- 12.00 m. Pipe Culvert, 610mm (24″dia.)

